Clarifying the different settings for “Christmas unblock”
Here is a clarification on the different settings for
“Christmas unblock”:
Current settings (as of 18/01/2018) and what they mean
NO RESTRICTION = no restriction: all blocks
removed / nothing blocked
"Cannot travel during Christmas" = blocked from 12/23
to 01/01 (ie. western europe type christmas)
"Cannot travel during Russian Christmas" = blocked from
12/24 to 01/08 (ie. russian orthodox christmas)
"Cannot travel during Christmas and ARABIC holidays" =
blocks
"normal" christmas and NY: (12/24 to 01/08)
blocks
muslim new year (eve?): (10/02)
blocks first
day of Ramadan: (06/06)
blocks
first day of Eid Al Fitr: (06/25)
"Cannot travel during Christmas and CHINESE holidays 2018" =
blocks Christmas: (12/24 to 01/08)
blocks Chinese new year: (02/16 to 02/19)
blocks Chinese national day: (10/01 to 10/03)
"Cannot travel during Christmas and ISLAMIC holidays 2018" =
blocks Christmas: (12/24 to 01/08)
blocks muslim new year: (09/11)
blocks ramadan: (05/16)
blocks Eid-ul-Fitr: (06/13 to 06/15)
blocks Eid-ul-Adha: (08/21 to 08/25)
Related Articles
What the different "Campaign greet formality" settings look like
What the different "Campaign greet formality" settings look like We can control the email salutation via the "Campaign greet formality" option of the campaign editor in the backoffice. Here is what the email salutation will look like for each setting ...
Clarifying the default decline reasons (or "campaign checks")
I can confirm that the following decline reasons (or "campaign checks") are defaults and are baked into the system: Name check (which is, for example, "Applicant/Passport Mismatch") DOB check (which is, for example, "The age of the participant does ...
All about responsive banner sizes
All about responsive banner sizes All about responsive banner sizes for campaign sites. Usage patterns Tends to be one of the following: Every page of campaign site has same banner [used by some campaigns] "Home" or "landing" page has a particular ...
[DevOps] Hyve staging server is MASSIVELY out of sync with production
UPDATE August 2019: Tillo (used to be Reward Cloud) can - and do - access the Hyve staging server for testing Hyve's Partner API Daniel Rhodes Private . 23 Jul 2019 10:36 AM . Edited Lingering issues: [] Is staging DB structure up-to-date with ...
An improvement (the actual spec?) for rejection stages
---- Hi Dev team, Mareike has reported an additional error in the back office stages on Stoneleigh. Please see below for her report on the issue: as discussed for Stoneleigh we should have two rejection stages: For awaiting PDF mail ( 1st stage) it ...